
Well, over the last couple of days, we finally got the Heart Space Base land leveled by Rodney and his CAT machine.

In just one day, Rodney got our circle leveled on two levels so that once we get things together and the foundations dug, we can start building our 25 foot diameter earthbag dome started. It’s been a long road, but we are really looking forward to getting going with this creation. Also, we are going to be able to get our water tank put into the ground to collect water from the springs – thanks to Rodney’s help.
The ground has gone from being a pretty steep slope, to some level area with a big wall up the top.

Heart Space Base before digger.
Here follows some photos taken during the excavation.

This slideshow will show a lot of what occurred. It is hard to see exactly what has happened, but suffice to say, it is huge. Future pictures will show more of what was achieved this day. I will also soon do a better job of putting photos in order.
Love all ways ❤